Home
W&WW Blog Case Histories Books Shop Amazon Member Survey Advertise ?
Buyer's Guide News Help Forum Ask Tom! Jobs Videos Online Training

Water and Wastewater.com Help Forums

Click here now

Search

Welcome, Guest. Please Login or Register
May 22nd, 2013, 10:57am
Top 10 Members
Runyan Sobisch Keenan Seghers Santa Cruz Gillen Kendall Orlebeke Ayrus Kersey
  HomeHelpSearchLoginRegister  
Plant Operation (Read 152 times)
MDuDu
YaBB Newbies
*
Offline

I love Water and
Wastewater.com

Posts: 1
Florida
Gender: male

Company or Organization: OC utilities
Plant Operation
May 05th, 2012, 11:26am
 
Hello everyone


I work at a Modified Ludzack-Ettinger WWTP here in Florida and we are permitted for annual average daily flow of 7.5 MGD.  Currently the plant treats wastewater at AADF of ~5 MGD.  Our influent BOD strength remains relatively constant ~ 250 mg/l ± 50 year round and we run the plant with the aeration MLSS 2800 – 3500.

Everything seems backwards from what the books say about the settleometer and wasting (we waste more in the winter less in the summer).  More MLSS is needed treat same amount of BOD due to temperature change.  I asked the older operators about this and they tell me it’s due to the plant being below capacity.

My question is what aspect of being below capacity would cause the plant to behave as it does?

By the way we have been through hurricanes to very dry weather and nothing seems to affect the plant.                        

                                                                                              Thanks
Cool
Back to top
 
 
  IP Logged
Geoff
God Member
*****
Offline



Posts: 1006

Gender: male

Company or Organization: Retired.  :-)
Re: Plant Operation
Reply #1 - May 5th, 2012, 9:39pm
 
Nothing to do with plant capacity...

Step back a little and think about what is happening.

In essence BOD load on the plant is directly related to sludge production (wasting).  If your wasting is reduced in a period (summer in your case) then it is likely your summer BOD loading is lower than your winter loading.

It is always a good idea to load all your data into a spreadsheet and look to see if the calculated loads etc match what you're observing.

My wastewater motto was always "Nothing happens without a cause" and I used to want to know specifically what was causing my plants to behave the way they did.  Never accept "...oh it just does it..."

Plot all your data and flick it to me and I'll review it if you like.

Cheers

Back to top
 
« Last Edit: May 6th, 2012, 9:29pm by Geoff »  

Sharing the knowledge helps everyone.
  IP Logged
The sludge judge
God Member
*****
Offline



Posts: 649
Wisconsin
Gender: male

Company or Organization: private
Re: Plant Operation
Reply #2 - May 6th, 2012, 3:59pm
 
sludge yield is actually higher as the temperature decreases. This is because the metabolism of the bacteria is slower and there's less endogenous activity. (which is basically the bugs eating themselves). This is normal, especially in a longer sludge age BNR plant like yours.

I've found at a few plants that I can run a lower sludge age in the summer due to this where I need to wase a little more in the winter. The MLSS (and the F/M stays the same even with the lower wasting rate).


Also don't waste based on the settleometer. This gets a lot of people in trouble. Certain things will give you a higher SVI and need to be identified microscopically if you see the SVI increasing.

best regards,

Ryan
Back to top
 
 
  IP Logged