Home
W&WW Blog Case Histories Books Shop Amazon  Member Survey Advertise
Buyer's Guide News Help Forum Ask Tom! Jobs Videos Newsletters

Search

Directory Links

  Plant Directory Home
  Search Plants
  New Plant Listings
  Random Listings
  Add Your Plant
  Modify Plant Listing
  Login

More Links

  Industry Directory
 
Plants Directory
 
Video Center
 
This Week's Newsletter
 
Water Blog
 
Ask Tom! Archive
 
Trade Shows & Events
 
Industry Associations
 
Journals & Magazines
 
Tank Size Calculators
 
Add Your Plant Now
 
Add Your Company
 
Add Your Resume
 
Contact Us

Sign Up Free!

Click here to read past issues
"Read by over 7,700 Industry
Professionals each week."


Enter your business email
address & click to sign up
Read Past Issues Here

Featured Book
From
Amazon

Click here for more

Free Shipping
on all orders over $25.

 

 

Water and Wastewater Plant Directory
L
Click here now
Gander, Newfoundland, Canada
Gander Water Treatment Plant
80 Armstrong Blvd.
Gander, Newfoundland, A1V1C9
Canada

Contact Information:
Contact:  Terry Murphy
Email:  tmurphy@fayenvcanada.com
Telephone:  709 738 1252
Fax:  709 754 4183

Plant Operation: Municipal

Processing: Water

Web site:
http://www.gandercanada.com/services/water_services.htm

Plant/Process Description:
The Gander Water Treatment Plant is a true milestone for Fay Environmental Canada Limited. This being our first design and build plant in Canada.

The raw water is pumped from Gander Lake where the existing Raw Water Pumps are located. The water is pumped through an existing band screen before entering the pumps at the station. This water then flows through a Raw Water Rising Main to the treatment plant which is centrally located in the town approximately 2 km from Gander Lake.

Once the raw water reaches the plant it is distributed from a Raw Water header through four main process streams, each independent stream can process up to 150 m3 /hr/ or 660 usgpm. The maximum plant capacity is 14.4 MLD or 3.8 million US Gallons per day.

The pre-filtration for each stream is provided by pressure sand filtration using graded filtration sand as its media. The water then flows to the second stage of treatment which is a stage of Ozone Oxidation.

Ozone is generated on site using a low frequency Corona discharge type water-cooled ozone generator complete with motive water pumps, and gas injectors. Screw type air compressor sets in acoustic enclosures provide the feed gas for the system which also incorporates on site Oxygen generation. Excess Ozone is scrubbed through a Thermal Catalytic destructorAfter the water leaves the ozone reactor vessel it enters a multimedia Pressure Filter This filter is identical in construction to the inlet pre- filters and constitutes the third stage of treatment. Once the water passes through the multimedia filter it then enters the final and fourth stage of treatment an activated carbon filter.

All of the process units used in the system are of Stainless Steel construction as is the interconnecting pipework.

The operation of the system is fully automated with respect to production and shut down as are the filter washing sequences. This level of control and automation is provided by a fully integrated bespoke SCADA system which also monitors the performance of the system with respect to quality variables such as Turbidity, ORP & pH.The plant is stopped and started on demand according to the level in the existing treated water service reservoir located in the town. The operation of the Lake Pumping station, the Treatment Plant and the reservoir with associated booster pumps is controlled and monitored from the central operator work station in the treatment plant control room. This control system can also be accessed via internet link from any other location thereby minimizing nuisance call out visits.

The treatment system in its entirety comprising the main process, all pipework and valves, Pumps, machinery and Compressors, all ancillary systems including the instrumentation and control and automation was provided by Fay Environmental Limited. As the designer, process contractor and General Contractor Fay Environmental provides a unique and economically cost effective service to the needs of the Canadian drinking water sector by marshalling all required components and disciplines under one contract and responsibility.

Owner:
Town of Gander
Web site:  http://www.gandercanada.com/
Operating Company:
Fay Environmental Canada Limited
Web site:  http://www.fayenvcanada.com/
Directions:
Gander,NL. is located 300 km west of St.John's,NL

x
Plant Directory HomeSearch PlantsNew Plant ListingsRandom Listings
Add Your PlantModify Plant ListingLogin

 
 
 
Disclaimer:  Water and Wastewater.com provides the information on this page for reference purposes only. We do not certify the accuracy of the information provided by third-party individuals for this listing.
 
 
 
I

Buyers Guide | News | Help Forum | Ask Tom! Column | Jobs | Resumes | Newsletters

W&WW Blog | Case Histories | Books | Shop Amazon | Member Survey | Advertise

.

Copyright © 1998-2008 Camber Southeast, Inc.
Web Site:  http://www.waterandwastewater.com
Privacy Statement

I
Home