Home
W&WW Blog Case Histories Books Shop Amazon  Member Survey Advertise
Buyer's Guide News Help Forum Ask Tom! Jobs Videos Newsletters

Search

Directory Links

  Plant Directory Home
  Search Plants
  New Plant Listings
  Random Listings
  Add Your Plant
  Modify Plant Listing
  Login

More Links

  Industry Directory
 
Laboratory Forum
 
Plants Directory
 
Video Center
 
This Week's Newsletter
 
Water Blog
 
Ask Tom! Archive
 
Trade Shows & Events
 
Industry Associations
 
Journals & Magazines
 
Tank Size Calculators
 
Add Your Plant Now
 
Add Your Company
 
Add Your Resume
 
Contact Us

Sign Up Free!

Click here to read past issues
"Read by over 7,700 Industry
Professionals each week."


Enter your business email
address & click to sign up
Read Past Issues Here

Featured Book
From
Amazon

Click here for more

Free Shipping
on all orders over $25.

 

 

Water and Wastewater Plant Directory
L
Click here now
Boca Raton, Florida, USA
Boca Raton Wastewater Plant
1401 Glades Road
Boca Raton, Florida, 33431
USA

Contact Information:
Contact:  Gabe Destio
Email:  gdestio@ci.boca-raton.fl.us
Telephone:  561-338-7331
Fax:  561-338-7345

Plant Operation: Municipal

Processing: Wastewater

Web site:
http://www.ci.boca-raton.fl.us/Util/wastewaterplant.shtm

Plant/Process Description:
The Wastewater Treatment Plant is located inside the Utility Services complex on Glades Road and Interstate 95. The plant and the entire complex were designed and are operated with an eye on meeting the Cityís needs without imposing on its atmosphere.

The original plant at the Utilities Services Glade Road Complex was put into operation in 1974 and was designed to treat 10 million gallons per day (mgd) of wastewater. Modifications increased the treatment capacity by 2 mgd in the mid-1980. A late 1980ís expansion program provided 17.5 mgd of treatment capacity to meet demands expected beyond the year 2020. New buildings and structures were designed and constructed to blend with the surroundings. Included in the improvements were an administration building housing an up-to-date laboratory and a computerized monitoring and control suite, as well as offices and training areas.

The grounds of the plant include open, landscaped spaces in keeping with the community's emphasis on a park-like atmosphere. Further complying with objectives to promote preservation of natural resources, the plant was designed to provide reclaimed water for irrigation at the Utilities Complex. This has been expanded in Project IRIS. The original plant at the Utilities Services Glade Road Complex was put into operation in 1974 and was designed to treat 10 million gallons per day (mgd) of wastewater. Modifications increased the treatment capacity by 2 mgd in the mid-1980. A late 1980ís expansion program provided 17.5 mgd of treatment capacity to meet demands expected beyond the year 2020.

New buildings and structures were designed and constructed to blend with the surroundings. Included in the improvements were an administration building housing an up-to-date laboratory and a computerized monitoring and control suite, as well as offices and training areas. The original plant at the Utilities Services Glade Road Complex was put into operation in 1974 and was designed to treat 10 million gallons per day (mgd) of wastewater. Modifications increased the treatment capacity by 2 mgd in the mid-1980. A late 1980ís expansion program provided 17.5 mgd of treatment capacity to meet demands expected beyond the year 2020. New buildings and structures were designed and constructed to blend with the surroundings. Included in the improvements were an administration building housing an up-to-date laboratory and a computerized monitoring and control suite, as well as offices and training areas.

The grounds of the plant include open, landscaped spaces in keeping with the community's emphasis on a park-like atmosphere. Further complying with objectives to promote preservation of natural resources, the plant was designed to provide reclaimed water for irrigation at the Utilities Complex. This has been expanded in Project IRIS.

Designed to effectively and efficiently help control water pollution in an environmentally sound manner, the plant uses the conventional Activated Sludge Treatment Process with primary clarification.

Treatment Process

Primary Clarification: Wastewater flowing into the plant passes through automatic bar screens that retain materials above 1/4-inch diameter. Grit is removed in two forced vortex type grit collectors and ultimately disposed of in a landfill. Two 100-foot diameter domed primary clarifiers remove and dispose of settleable organic solids.

Activated Sludge: Still containing organic substances that must be removed before discharge, the wastewater passes through three aeration "trains", each "train" consisting of three basins. These trains contain large concentrations of microorganisms- called activated sludge - that feed on the organic matter in the wastewater. As these microorganisms require oxygen to grow, air is introduced into the wastewater.

The activated sludge and wastewater then flows to three 110-foot diameter and two 105-foot diameter secondary clarifiers where the sludge settles. The sludge is removed, and a variable percentage is returned to the aeration trains to act as a catalyst for that process.

The effluent, with 95 percent of the biochemical oxygen demand and suspended solids removed, is disinfected through chlorination and is then pumped through a five-mile-long outfall terminating about 5,000 feet offshore in the Atlantic Ocean at a depth of 90 feet.

Sludge consists of the solids that have been separated from the wastewater in the treatment processes. It must be treated and dewatered prior to disposal. The waste activated sludge, which has settled in the bottom of the secondary clarifiers, is pumped to the gravity belt thickeners, where 75 percent of the water in the sludge is removed. This thickened sludge is then pumped to two of three 80-foot diameter primary digesters and one 80-foot diameter secondary digester. Sludge that has settled in the bottom of the primary clarifiers is pumped directly to the digesters.

In the digesters, anaerobic bacteria are used to break down the organic solids. Methane gas and carbon dioxide are by-products of this process, and the methane gas is used to heat the digesters. Three belt filter presses dewater the digested sludge prior to landspreading.

The grounds of the plant include open, landscaped spaces in keeping with the community's emphasis on a park-like atmosphere. Further complying with objectives to promote preservation of natural resources, the plant was designed to provide reclaimed water for irrigation at the Utilities Complex. This has been expanded in Project IRIS.

Designed to effectively and efficiently help control water pollution in an environmentally sound manner, the plant uses the conventional Activated Sludge Treatment Process with primary clarification.

Owner:
City of Boca Raton
Web site:  http://www.ci.boca-raton.fl.us/
Operating Company:
City of Boca Raton
Web site:  http://www.ci.boca-raton.fl.us/
Directions:

x
Plant Directory HomeSearch PlantsNew Plant ListingsRandom Listings
Add Your PlantModify Plant ListingLogin

 
 
 
Disclaimer:  Water and Wastewater.com provides the information on this page for reference purposes only. We do not certify the accuracy of the information provided by third-party individuals for this listing.
 
 
 
I

Buyers Guide | News | Help Forum | Ask Tom! Column | Jobs | Resumes | Newsletters

W&WW Blog | Case Histories | Books | Shop Amazon | Member Survey | Advertise

.

Copyright © 1998-2010 Camber Southeast, Inc.
Web Site:  http://www.waterandwastewater.com
Privacy Statement

I
Home