Home
W&WW Blog Case Histories Books Shop Amazon  Member Survey Advertise
Buyer's Guide News Help Forum Ask Tom! Jobs Videos Newsletters

Search

News Center Links

 News Center Home

  Industry News
  Case Histories
  Air Quality
  Chemicals
  Coatings
  Cogeneration
  Controls
  Conveying
  Dewatering
  Piping
  Pumping
  Software
  Systems
  Tanks
  Valves
  Water Supply
  Wastewater

More Links

  Industry Directory
 
Plants Directory
 
Video Center
 
This Week's Newsletter
 
Water Blog
 
Ask Tom! Archive
 
Trade Shows & Events
 
Industry Associations
 
Journals & Magazines
 
Tank Size Calculators
 
Add Your Plant Now
 
Add Your Company
 
Add Your Resume
 
Contact Us

Sign Up Free!

Click here to read past issues
Industry Newsletter

Enter your business email
address & click to sign up
Read Past Issues Here

Featured Book
From
Amazon

Click here for more

Free Shipping
on all orders over $25.

 
 
Case Histories : Wastewater


Kruger Case Study : City of Palm Coast, FL
By Kate Koerber
Sep 18, 2008
  E-mail article
Printer friendly page
  .
Cary, NC -- The City of Palm Coast, located on the east coast of Florida, expanded their existing Wastewater Treatment Plant (WWTP) to increase capacity to 6.83 MGD due to population growth, as well as add the production of reclaimed reuse water for use within the City. The existing facility disposed effluent wastewater at rapid infiltration basin sites, spray fields, and a wet weather discharge site.

With the addition of tertiary filtration, the plant added disposal of effluent to reclaimed reuse customers, which use the high quality water for golf course and lawn irrigation; therefore, providing the benefit of preventing the wasting of potable or surface water.

In conjunction with the expansion of mechanical equipment for the plant improvements, the City of Palm Coast upgraded the plant’s automation. The plant desired to expand their existing instrumentation and control for additional ease of operation.

Plant Overview

The Palm Coast WWTP consists of 6.83 MGD primary, secondary, and tertiary treatment. The primary treatment includes automatic, continuous self-cleaning mechanical barscreens, biofilter odor control and grit removal.

The existing secondary treatment system consists of two identical process trains, each inclusive of a single oxidation ditch and two secondary clarifiers. The plant expansion added one process train comprised of a Kruger AE-DENITRO single ditch system followed by two new circular clarifiers.

Tertiary treatment consists of Kruger Hydrotech Discfilters and high level disinfection (“bulk” NaOCl). Treatment of the biosolids includes aerobic digestion and sludge thickening. After which, the sludge is hauled offsite for final treatment at a residuals management facility.

For the plant automation, Kruger provided PLC control panels for the Kruger supplied equipment, as well as additional equipment added during the expansion. Kruger also provided a plant wide control/SCADA system, instrumentation, motor control centers (MCC) and variable frequency drives (VFD).

Process Solution

To meet the challenges identified by the City of Palm Coast, the WWTP incorporated an additional process train to the existing two, inclusive of Kruger’s AE-DENITRO single ditch system to treat an additional design flow of 2.275 MGD for biological treatment.

The AE-DENITRO ditch system at Palm Coast consists of five (5) 40 hp brush aerators, two (2) 4.4 hp submersible mixers and one (1) effluent weir. The AE-DENITRO process uses Phased Isolation Ditch (PID) technology by alternating between aerobic (for nitrification) and anoxic (for denitrification) phases to help reduce the effluent TN. The phases work by separating aeration and mixing in the different ditches, as well as incorporating automated dissolved oxygen (DO) control.


The Kruger Hydrotech Discfilter system consists of four (4) HSF2218-2F Discfilter units, installed below ground in concrete basins, for tertiary treatment to meet the entire plant’s TSS effluent requirements. The Discfilters use cloth filter media panels mounted onto vertical disc segments to separate solids from water.

The Kruger controls system upgrade consisted of an “open solution” utilizing Ethernet technology to protect the city’s ability to utilize tomorrow’s technologies. The Ethernet –based process control system implemented the open Modbus TCP protocol. System components include “intelligent” MCCs that communicate directly with the plant programmable automation controllers.

Conclusion

The effectiveness of Kruger’s AE-DENITRO system, followed by the Kruger Hydrotech Discfilter for tertiary treatment, allowed the Palm Coast WWTP to expand its capacity to accommodate the City’s population growth and add the production of reclaimed reuse water for distribution to customers.

In addition, Kruger automation system, instrumentation and MCC allowed the City to effectively and efficiently operate the plant on and offsite. Overall, the City gained the value and ease of working with one supplier, Kruger, for providing the central equipment for the upgrade, as well as the main portion of the plant controls.

For more information contact:
Kruger Inc.
401 Harrison Oaks Blvd, Suite 100
Cary, NC 27513
Phone: 919-677-8310
Fax: 919-677-0082
Web site: http://www.krugerusa.com/


© Copyright 1998 - 2012 Water and Wastewater.com

Top of Page

 
Send news and case histories to:  news@waterandwastewater.com
 

 

I Search News I



I Live Newsfeed I

Increase traffic and add
content to your website
with our exclusive
newsfeed generator.

Our live newsfeed
allows you to
include news
headlines from our
News Center, right
on your homepage.

Headlines update in
real-time, automatically.

Click here to create
your own newsfeed!

 

 

 
 
I

Buyers Guide | News | Help Forum | Ask Tom! Column | Jobs | Resumes | Newsletters

W&WW Blog | Case Histories | Books | Shop Amazon | Member Survey | Advertise

.

Copyright © 1998-2011 Camber Southeast, Inc.
Web Site:  http://www.waterandwastewater.com
Privacy Statement

I
Home