Tag: Trickling Filter/Solids Contact

Jan 31
Metropolitan St Louis Sewer District Bissell Point Wastewater Treatment Plant

A Technical Review of St. Louis’ Largest Wastewater Infrastructure Asset FACILITY BASIC INFORMATION Plant Name: Bissell Point Wastewater Treatment Plant Location: 10 East Grand Avenue, St. Louis, MO 63147 Operating Authority: Metropolitan St. Louis Sewer District (MSD Project Clear) Design Capacity (Secondary): 210 MGD Peak Hydraulic Capacity: >400 MGD Current Average Flow: ~145 MGD Population […]