Category: Water Supply

Feb 03
City Of Salem Wastewater Treatment Plant

Location: Salem, Oregon | Operating Authority: City of Salem Public Works FACILITY BASIC INFORMATION Plant Name: Willow Lake Water Pollution Control Facility (WPCF) Location: 5915 Windsor Island Road N, Salem, OR 97303 Operating Authority: City of Salem Public Works Department Design Capacity (Peak Wet Weather): 155 MGD Current Average Dry Weather Flow: ~25 MGD Population […]

Feb 03
Clean Water Services Durham Advanced Wastewater Treatment Facility

Facility Profile: The authoritative technical resource for engineers, operators, and industry professionals regarding the Durham AWTF in Tigard, Oregon. FACILITY BASIC INFORMATION Plant Name: Durham Advanced Wastewater Treatment Facility Location: 16060 SW 85th Ave, Tigard, Washington County, Oregon Operating Authority: Clean Water Services (CWS) Design Capacity (Dry Weather): 25.7 MGD Peak Hydraulic Capacity: 113 MGD […]

Feb 03
City Of Eugene Water Pollution Control Facility

Plant Name: Eugene/Springfield Water Pollution Control FacilityLocation: 410 River Avenue, Eugene, OR 97404Operating Authority: Metropolitan Wastewater Management Commission (MWMC); Operated by City of EugeneDesign Capacity: 49 MGD (Average Dry Weather) / 277 MGD (Peak Wet Weather)Current Average Flow: ~30 MGDPopulation Served: ~250,000 residentsService Area: Eugene, Springfield, and unincorporated Lane CountyReceiving Water Body: Willamette RiverNPDES Permit […]

Feb 03
City Of Portland Columbia Boulevard Wastewater Treatment Plant

FACILITY BASIC INFORMATION Plant Name: Columbia Boulevard Wastewater Treatment Plant (CBWTP) Location: 5001 N Columbia Blvd, Portland, Multnomah County, Oregon Operating Authority: City of Portland Bureau of Environmental Services (BES) Design Capacity (Dry Weather): ~100 MGD Peak Wet Weather Capacity: 450 MGD Current Average Flow: ~70 MGD Population Served: ~665,000 residents Service Area: City of […]

Feb 03
City Of Vancouver Bi County Wastewater Treatment Plant

Also serving the Clark Regional Wastewater District (Bi-Jurisdictional Service Area) FACILITY BASIC INFORMATION Plant Name: Westside Wastewater Treatment Plant Location: 2323 W Mill Plain Blvd, Vancouver, Clark County, WA 98660 Operating Authority: City of Vancouver Public Works Design Capacity (Max Month): 28.3 MGD Peak Hydraulic Capacity: ~60 MGD Current Average Flow: ~21-24 MGD Population Served: […]

Feb 02
City Of Spokane Riverside Wastewater Treatment Plant

Location: Spokane, Washington | Operating Authority: City of Spokane Wastewater Management Department 1. INTRODUCTION The Riverside Park Water Reclamation Facility (RPWRF) serves as the cornerstone of wastewater infrastructure for the Inland Northwest. Located on the banks of the Spokane River, this facility is the largest advanced wastewater treatment plant in Eastern Washington, with a design […]

Feb 02
City Of Tacoma Central Wastewater Treatment Plant

The authoritative technical resource for engineers, operators, and industry professionals. FACILITY BASIC INFORMATION Plant Name: Central Wastewater Treatment Plant (CTP) Location: 2201 Portland Ave E, Tacoma, Pierce County, Washington Operating Authority: City of Tacoma Environmental Services Department Peak Hydraulic Capacity: 150 MGD Average Dry Weather Flow: ~20-23 MGD Population Served: Approx. 200,000+ (Direct and wholesale) […]

Feb 02
King County Wastewater Treatment Division South Treatment Plant Renton

FACILITY BASIC INFORMATION Plant Name: South Treatment Plant (South Plant) Location: Renton, King County, Washington Operating Authority: King County Wastewater Treatment Division (WTD) Design Capacity (AWWF): 115 MGD (Average Wet Weather Flow) Peak Hydraulic Capacity: 325 MGD Current Average Flow: ~90 MGD (Combined Annual Average) Population Served: Approx. 800,000 residents Service Area: South and East […]

Feb 02
King County Wastewater Treatment Division West Point Treatment Plant Seattle

FACILITY BASIC INFORMATION Plant Name: West Point Treatment Plant Location: 1400 Discovery Park Blvd, Seattle, King County, WA 98199 Operating Authority: King County Wastewater Treatment Division (WTD) Design Capacity: 133 MGD (Average Wet Weather), 440 MGD (Peak Hydraulic) Current Average Flow: ~90 MGD (Dry Weather) Population Served: Approx. 1.8 million (Regional System Total) Service Area: […]

Feb 01
Alexandria Renew Enterprises AlexRenew Wastewater Treatment Plant

FACILITY BASIC INFORMATION Plant Name: AlexRenew Water Resource Recovery Facility (WRRF) Location: Alexandria, Fairfax County, Virginia Operating Authority: Alexandria Renew Enterprises (AlexRenew) Design Capacity: 54 MGD (Average Daily Flow) Current Average Flow: ~35-40 MGD Population Served: ~320,000 residents Service Area: City of Alexandria and portion of Fairfax County Receiving Water Body: Hunting Creek (tributary to […]