FACILITY BASIC INFORMATION Plant Name: North Canadian Wastewater Treatment Plant (NCWWTP) Location: 2313 N Eastern Ave, Oklahoma City, OK 73111 Operating Authority: Oklahoma City Water Utilities Trust (OCWUT) Design Capacity: 82.0 MGD (Average Daily Flow) Current Average Flow: ~55-60 MGD Peak Flow Capacity: ~160 MGD Service Area: Central Oklahoma City, Nichols Hills, The Village, and […]
FACILITY BASIC INFORMATION Plant Name: North Topeka Wastewater Treatment Plant Location: 1600 NW Button Road, Topeka, Shawnee County, Kansas 66618 Operating Authority: City of Topeka Utilities Department (Water Pollution Control Division) Design Capacity: 8.0 MGD (Average Daily Design Flow) Current Average Flow: ~3.6 MGD Peak Hydraulic Capacity: 16.0 MGD Population Served: Approx. 35,000 (North Topeka […]
Introduction In municipal wastewater treatment and industrial sludge handling, the premature failure of progressive cavity (PC) pump stators remains one of the most persistent and costly maintenance burdens. Engineers frequently specify robust hydraulic conditions, yet the interface between the pump mechanics and the electrical control system is often where reliability disintegrates. A startling volume of […]
Biosolids Management: Best Practices for Treatment Plants Biosolids management is where regulatory pressure, operational cost, and community risk collide—get the decisions right and you control disposal costs and recover resources; get them wrong and you face fines, complaints, and rising hauling bills. This practical guide gives treatment plant operators and engineers a technical roadmap for […]
Authoritative Technical Resource for Engineers, Operators, and Industry Professionals Clarification on Operating Authority: While the Kansas City Board of Public Utilities (BPU) provides water and electric service to the region (including the nearby Nearman Creek Power Station and Nearman Water Treatment Plant), municipal wastewater services in Kansas City, KS are managed by the Unified Government […]
Introduction The failure of a chemical feed system or sludge transfer unit in a water treatment plant often isn’t caused by a defective pump; it is caused by a failure in the commissioning process. In municipal and industrial applications, up to 60% of early-life equipment failures can be traced back to improper installation, inadequate pipe […]
INTRODUCTION One of the most persistent causes of premature equipment failure in municipal and industrial fluid handling systems is the disconnect between the design point and the actual operating reality. Engineers frequently specify pumps for a peak flow condition that occurs less than 5% of the time, leaving operators to manage equipment that runs inefficiently—and […]
Introduction to Intake Hydraulics For municipal and industrial engineers, the physical geometry of a pump station is often treated as secondary to the selection of the pump itself. However, industry data suggests that nearly 30% of premature pump failures—manifesting as vibration, cavitation damage, and bearing wear—are directly attributable to poor intake conditions rather than mechanical […]
Coagulation and Flocculation: Essential Steps in Water Purification Coagulation flocculation water treatment is the frontline process that decides whether downstream filtration, membranes and disinfection will meet turbidity and DBP precursor targets. This article turns coagulation chemistry into practical decisions—coagulant and polymer selection, rapid mix and flocculation G and time ranges, jar testing and pilot methods, […]
Wastewater Aeration Systems: Improving Treatment Efficiency Aeration system wastewater installations typically consume 45 to 60 percent of a municipal treatment plant energy budget and determine whether biological processes meet effluent nitrogen and BOD targets. This guide gives plant managers, process engineers, and operators a practical roadmap for selecting, designing, operating, retrofitting, and maintaining aeration system […]