Facility Snapshot Plant Name: Noman M. Cole Jr. Pollution Control Plant (NMCPCP) Location: Lorton, Fairfax County, Virginia Operating Authority: Fairfax County Wastewater Management Program Design Capacity: 67 MGD Treatment Level: Advanced Tertiary (AWT) Receiving Water Body: Pohick Creek (tributary to Gunston Cove/Potomac River) 1. Introduction The Noman M. Cole Jr. Pollution Control Plant (NMCPCP) serves […]
FACILITY BASIC INFORMATION Plant Name: Boat Harbor Treatment PlantLocation: Newport News, VirginiaOperating Authority: Hampton Roads Sanitation District (HRSD)Design Capacity: 25.0 MGDCurrent Average Flow: ~16.0 MGDPopulation Served: Approx. 135,000 (part of regional system)Service Area: City of Newport News and City of HamptonReceiving Water Body: James River (Lower)NPDES Permit Number: VA0081256Year Commissioned: 1948 (Major expansion in 1994) […]
The authoritative technical resource for the Hampton Roads Sanitation District’s flagship facility in Norfolk, Virginia. FACILITY BASIC INFORMATION Plant Name: Virginia Initiative Plant (VIP) Location: Norfolk, Virginia (4201 Powhatan Avenue) Operating Authority: Hampton Roads Sanitation District (HRSD) Design Capacity: 40.0 MGD (Hydraulic) Peak Hydraulic Capacity: 80.0 MGD Population Served: Approx. 200,000+ (Norfolk, sections of Virginia […]
FACILITY BASIC INFORMATION Plant Name: Nansemond Treatment Plant (NTP) Location: 6925 Armstead Road, Suffolk, VA 23435 Operating Authority: Hampton Roads Sanitation District (HRSD) Design Capacity: 30 MGD (Million Gallons per Day) Current Average Flow: ~16-18 MGD Population Served: ~150,000+ residents (Suffolk, Isle of Wight, Smithfield) Service Area: City of Suffolk, Isle of Wight County, Town […]
The authoritative technical resource for the City of Columbia’s flagship treatment facility. FACILITY BASIC INFORMATION Plant Name: Metropolitan Wastewater Treatment Plant (Metro WWTP) Location: 1200 Simmon Tree Lane, Columbia, Richland County, South Carolina Operating Authority: Columbia Water (City of Columbia) Design Capacity: 60 Million Gallons per Day (MGD) Current Average Flow: ~32-38 MGD Population Served: […]
Location: Springfield, Greene County, MissouriOperating Authority: City of Springfield Department of Environmental Services Facility Snapshot Design Capacity: 42.5 MGD Peak Hydraulic Capacity: 100+ MGD Population Served: ~165,000 residents Service Area: South Springfield, Battlefield, and Greene County Receiving Water Body: Wilson’s Creek (James River Basin) NPDES Permit: MO-0023132 Treatment Level: Advanced Secondary with Tertiary Filtration and […]
FACILITY BASIC INFORMATION Plant Name: Blue River Wastewater Treatment Plant Location: 7300 Hawthorne Road, Kansas City, MO 64120 Operating Authority: KC Water (Kansas City Water Services Department) Design Average Flow: 105 MGD Peak Wet Weather Capacity: ~360 MGD (Secondary), ~960 MGD (Total Hydraulic) Population Served: ~300,000+ residents Service Area: Kansas City, MO (South of the […]
FACILITY BASIC INFORMATION Plant Name: Lemay Wastewater Treatment Plant Location: 8000 South Broadway, St. Louis, MO 63111 Operating Authority: Metropolitan St. Louis Sewer District (MSD Project Clear) Design Capacity: 240 MGD (Peak Wet Weather Secondary Treatment) Current Average Flow: ~67 MGD (Dry Weather) Population Served: ~400,000 residents equivalent Service Area: South St. Louis City, South […]
A Technical Review of St. Louis’ Largest Wastewater Infrastructure Asset FACILITY BASIC INFORMATION Plant Name: Bissell Point Wastewater Treatment Plant Location: 10 East Grand Avenue, St. Louis, MO 63147 Operating Authority: Metropolitan St. Louis Sewer District (MSD Project Clear) Design Capacity (Secondary): 210 MGD Peak Hydraulic Capacity: >400 MGD Current Average Flow: ~145 MGD Population […]
A Technical Profile of Southwest Indiana’s Primary Water Reclamation Facility FACILITY BASIC INFORMATION Plant Name: Evansville East Wastewater Treatment Plant (East WWTP) Location: 1301 South Waterworks Road, Evansville, IN 47713 Operating Authority: Evansville Water and Sewer Utility (EWSU) Design Capacity (Average): 22.5 MGD Peak Design Flow: 35.0 MGD (Secondary Treatment); >50 MGD (Wet Weather Capacity) […]