Tag: challenge

Feb 25
Effluent Discharge Standards: Compliance and Best Practices

Effluent Discharge Standards: Compliance and Best Practices Article Overview Article Type: How-To Guide Primary Goal: Equip municipal managers, plant operators, design engineers, and equipment manufacturers with a practical, technically rigorous roadmap to interpret effluent discharge standards, design and operate treatment systems to meet permits, implement reliable monitoring and reporting, and future-proof facilities for emerging contaminants […]

Feb 25
Screw Pump VFD Setup: Preventing Overheating

1. Introduction In the water and wastewater industry, the failure of screw pumpsβ€”whether large Archimedes lift pumps or progressive cavity sludge pumpsβ€”often stems not from hydraulic inadequacy, but from thermal mismanagement of the drive system. A surprising statistic from motor reliability studies indicates that for every 10Β°C rise in operating temperature above the rated limit, […]

Feb 25
Vertical Turbine VFD Setup: Preventing Overheating

INTRODUCTION In municipal water distribution and wastewater treatment, the vertical turbine pump (VTP) is a workhorse, valued for its efficiency and small footprint. However, when paired with Variable Frequency Drives (VFDs) without rigorous thermal and mechanical analysis, these systems frequently suffer from premature failure. A surprising industry statistic suggests that up to 30% of vertical […]

Feb 25
City Of Atlanta Utoy Creek Water Reclamation Center

FACILITY BASIC INFORMATION Plant Name: Utoy Creek Water Reclamation Center (WRC)Location: Atlanta, Fulton County, GeorgiaOperating Authority: City of Atlanta Department of Watershed Management (DWM)Design Capacity: 44 MGD (Max Month Daily Flow)Current Average Flow: ~24-30 MGDPopulation Served: Approx. 250,000+ residentsService Area: Southwest Atlanta, portions of Fulton County, City of East PointReceiving Water Body: Chattahoochee River (via […]

Feb 25
City Of Lincoln Northeast Wastewater Treatment Facility

FACILITY BASIC INFORMATION Plant Name: Northeast Water Resource Recovery Facility (NE WRRF)Location: 7000 N. 70th Street, Lincoln, Lancaster County, NebraskaOperating Authority: City of Lincoln Transportation and Utilities (LTU) – Wastewater SystemDesign Capacity: 22.0 MGD (Expanded Average Daily Flow)Current Average Flow: ~12 – 15 MGD (Variable with load shifting)Population Served: Serves Northern/Eastern Lincoln (City Total: ~295,000)Service […]

Feb 25
City Of Lincoln Theresa Street Wastewater Treatment Facility

Location: Lincoln, Lancaster County, NebraskaOperating Authority: City of Lincoln – Lincoln Transportation and Utilities (LTU)Design Capacity: 27.6 MGD (Average Daily)Service Area: Central and Southern LincolnReceiving Water Body: Salt Creek (Sub-basin of the Platte River)NPDES Permit Number: NE0020290 1. Introduction The Theresa Street Water Resource Recovery Facility (WRRF) serves as the primary wastewater treatment hub for […]

Feb 25
City Of Omaha Papillion Creek Wastewater Treatment Plant

The Authoritative Technical Resource for Engineers, Operators, and Industry Professionals FACILITY BASIC INFORMATION Plant Name: Papillion Creek Water Resource Recovery Facility (formerly Papillion Creek Wastewater Treatment Plant) Location: 15705 Harlan Lewis Road, Bellevue/Omaha, NE 68123 Operating Authority: City of Omaha Public Works Department (Sewer Maintenance Division) Design Average Flow: 32 MGD (Average Daily Flow capacity) […]

Feb 25
City Of Omaha Missouri River Wastewater Treatment Plant

The authoritative technical guide to Nebraska’s largest wastewater treatment and wet-weather control asset. FACILITY BASIC INFORMATION Plant Name: Missouri River Water Resource Recovery Facility (formerly Missouri River WWTP) Location: 5600 South 10th Street, Omaha, Douglas County, Nebraska Operating Authority: City of Omaha Public Works Department Design Capacity (Biological): 62 MGD (Average Daily) Peak Wet Weather […]

Feb 25
City Of Kalamazoo Water Reclamation Plant

FACILITY BASIC INFORMATION Plant Name: Kalamazoo Water Reclamation Plant (KWRP)Location: 1415 North Harrison Street, Kalamazoo, Kalamazoo County, MichiganOperating Authority: City of Kalamazoo Department of Public ServicesDesign Capacity: 53.3 MGD (Average Design Flow)Current Average Flow: ~27 MGDPopulation Served: Approx. 200,000 residents (Regional System)Service Area: City of Kalamazoo and 18 surrounding jurisdictions (municipalities and townships)Receiving Water Body: […]

Feb 25
City Of Flint Wastewater Treatment Plant

The authoritative technical resource for the City of Flint’s primary wastewater treatment infrastructure. FACILITY BASIC INFORMATION Plant Name: City of Flint Water Pollution Control Facilities (WPCF) Location: G-4652 Beecher Road, Flint, Genesee County, Michigan Operating Authority: City of Flint Department of Public Works / Utilities Division Design Capacity: 50 MGD (Dry Weather) Current Average Flow: […]