Tag: water treatment

Jan 18
JWC Environmental vs Lakesideoration for Screenings: Pros/Cons & Best-Fit Applications

Introduction One of the most persistent operational headaches in modern wastewater treatment is the management of rags, wipes, and non-dispersibles. For municipal engineers and plant superintendents, the failure of headworks equipment does not just mean manual cleaning; it results in deragging pumps downstream, compromised biological processes, and significant unscheduled overtime. In the U.S. market, two […]

Jan 18
North Texas Municipal Water District Wilson Creek Wastewater Treatment Plant

Location: Allen, Collin County, TexasOperating Authority: North Texas Municipal Water District (NTMWD)Design Capacity: 64 MGD (Annual Average)Receiving Water Body: Wilson Creek (Tributary to Lavon Lake) 1. Introduction The Wilson Creek Regional Wastewater Treatment Plant (RWWTP) serves as a cornerstone of environmental infrastructure for the rapidly growing Collin County region of North Texas. Owned and operated […]

Jan 17
Strategies for Volatile Solids Reduction in Wastewater Treatment

Strategies for Volatile Solids Reduction in Wastewater Treatment Understanding Volatile Solids in Wastewater Volatile solids (VS) are a critical component of wastewater, representing the organic matter that can be decomposed by microorganisms. They play a significant role in the efficiency and effectiveness of treatment processes. Effective volatile solids reduction is essential for optimizing resource recovery […]

Jan 17
San Antonio Water System Dos Rios Wastewater Treatment Plant

FACILITY BASIC INFORMATION Official Name: Steven M. Clouse Water Recycling Center (Formerly Dos Rios Water Recycling Center) Location: 3495 Valley Road, San Antonio, Bexar County, Texas 78221 Operating Authority: San Antonio Water System (SAWS) Design Capacity: 125 MGD (Average Daily Flow) Current Average Flow: ~75–85 MGD Population Served: Approx. 1.2 million (Greater San Antonio Metro) […]

Jan 17
City Of Houston 69th Street Wastewater Treatment Plant

The Authoritative Technical Resource for Engineers and Industry Professionals FACILITY BASIC INFORMATION Plant Name: 69th Street Wastewater Treatment Plant Location: 2525 S/Sgt. Macario Garcia Drive, Houston, Harris County, Texas Operating Authority: City of Houston Public Works (Houston Water) Design Capacity: 200 MGD (Permitted Daily Average Flow) Peak 2-Hour Flow: 400 MGD Population Served: Approx. 1.2 […]

Jan 17
Sanitaire vs SSI Blowers Equipment: Comparison & Best Fit

Introduction In the design and operation of activated sludge wastewater treatment plants, the aeration system represents the single largest consumer of energy, typically accounting for 50% to 70% of a facility’s total electrical demand. For consulting engineers and utility directors, selecting the correct aeration infrastructure is not merely a purchasing decision; it is a twenty-year […]

Jan 17
Tarrant Regional Water District Village Creek Wastewater Treatment Plant Fort Worth

Location: Fort Worth, Tarrant County, Texas | Operating Authority: City of Fort Worth Water Department FACILITY BASIC INFORMATION Plant Name: Village Creek Water Reclamation Facility Location: 4500 Wilma Lane, Fort Worth, TX 76012 Operating Authority: City of Fort Worth Design Capacity: 166 MGD Peak Flow Capacity: 480 MGD (2-hour peak) Population Served: ~1.3 Million Service […]

Jan 17
Xylem (Flygt) vs Jaeger Blowers Equipment: Comparison & Best Fit

Introduction Aeration systems consume approximately 50% to 70% of the total energy usage in a typical biological wastewater treatment plant. For consulting engineers and plant directors, the selection of aeration equipment is not merely a component choice; it is the single largest determinant of the facility’s 20-year lifecycle cost profile. A common friction point in […]

Jan 17
Trinity River Authority Central Regional Wastewater Treatment Plant Dallas

Plant Name: Central Regional Wastewater System (CRWS) Location: 6500 West Jefferson Blvd, Dallas, Dallas County, Texas Operating Authority: Trinity River Authority of Texas (TRA) Design Capacity: 162 MGD (Annual Average) / 405 MGD (Peak 2-Hour) Current Average Flow: ~135-145 MGD Population Served: ~1.2 Million Service Area: 21 Contracting Parties (Cities and Districts in DFW Metroplex) […]

Jan 17
Top OEMs for Valve-Actuator Adaptation Kits

1. Introduction In the architecture of municipal and industrial fluid control systems, the interface between the valve and the actuator—commonly referred to as the adaptation kit, mounting kit, or valve automation hardware—is frequently the most overlooked component. While engineers invest significant hours specifying the hydraulic performance of the valve and the torque capabilities of the […]