Tag: physical

Jan 21
Top 10 Other – Other Manufacturers for Water and Wastewater

Introduction In the complex ecosystem of municipal and industrial treatment facilities, the “Big Three”—pumps, pipes, and valves—often dominate the initial design conversation. However, the operational success of a plant frequently hinges on the specialized auxiliary equipment that supports the primary treatment train. When engineers search for the Top 10 Other – Other Manufacturers for Water […]

Jan 21
Essex County Utilities Authority Newark

The primary wastewater treatment facility serving Newark and Essex County, New Jersey. FACILITY BASIC INFORMATION Plant Name: Newark Bay Treatment Plant Location: 600 Wilson Avenue, Newark, Essex County, New Jersey Operating Authority: Passaic Valley Sewerage Commission (PVSC) Design Capacity: 330 MGD (Annual Average) Peak Wet Weather Capacity: ~720 MGD Population Served: 1.5 million residents Service […]

Jan 21
JWC Environmental vs Franklin Miller Grit Removal Equipment

Introduction For municipal and industrial wastewater engineers, the protection of downstream process equipment—pumps, valves, centrifuges, and digesters—starts at the headworks. The improper reduction of solids or the inefficient separation of inorganic grit can lead to catastrophic pump cavitation, seal failures, and the rapid accumulation of rag balls in digesters that necessitates expensive cleanouts. When specifying […]

Jan 21
Middlesex County Utilities Authority Sayreville

FACILITY BASIC INFORMATION Plant Name: MCUA Central Wastewater Treatment Facility Location: Sayreville, Middlesex County, New Jersey Operating Authority: Middlesex County Utilities Authority (MCUA) Design Capacity: 147 MGD (Average Daily Flow) Peak Hydraulic Capacity: 350 MGD Population Served: Approx. 800,000 residents (plus substantial industrial base) Service Area: Lower Raritan River Basin (Middlesex, Somerset, and Union Counties) […]

Jan 20
JWC Environmental vs HUBER Grit Equipment: Comparison & Best Fit

INTRODUCTION Grit accumulation remains one of the most pervasive and costly “silent failures” in municipal wastewater treatment. While headworks screens provide visible capture, grit often bypasses preliminary treatment, settling in aeration basins, reducing digester capacity by up to 30%, and causing premature abrasion failure in downstream pumps. For consulting engineers and plant directors, the selection […]

Jan 20
Top OEMs for Confined Space & Gas Detection Systems

1. Introduction In the municipal and industrial water and wastewater sectors, gas detection is not merely an ancillary safety function; it is a critical operational imperative mandated by rigorous regulatory frameworks and necessitated by the inherent chemistry of the treatment process. The decomposition of organic matter, chemical dosing requirements, and the physical constraints of underground […]

Jan 20
Top 10 Instrumentation Manufacturers for Water and Wastewater

Introduction In the municipal and industrial water sector, data integrity is the bedrock of process control. Yet, a surprisingly high percentage of plant alarms—estimated by some automation audits to be over 40%—are nuisance alarms caused not by process failures, but by instrumentation drift, fouling, or improper specification. For the design engineer or plant superintendent, the […]

Jan 20
Jim Myers vs Serpentix for Solids Conveyance: Pros/Cons & Best-Fit Applications

Introduction The movement of dewatered biosolids, screenings, and grit is often the final bottleneck in modern treatment facilities. While headworks and biological processes receive significant engineering attention, the conveyance of “cake” solids remains a frequent source of operational headaches, from housekeeping nightmares to complete mechanical failures. Engineers tasked with facility upgrades often face a critical […]

Jan 20
Top OEMs for Thickening Equipment

1. Introduction to Thickening Equipment in Water and Wastewater Treatment In the hierarchy of unit processes within municipal and industrial wastewater treatment facilities, sludge thickening represents a critical intermediate step between liquid treatment and solids handling. While often overshadowed by the biological treatment processes upstream or the final dewatering and disposal downstream, thickening is the […]

Jan 19
City Of Akron Water Reclamation Facility

FACILITY BASIC INFORMATION Plant Name: Akron Water Reclamation Facility (WRF) Location: 2460 Akron-Peninsula Road, Akron, Summit County, Ohio Operating Authority: City of Akron Department of Public Service, Sewer Bureau Design Average Flow: 90 MGD Peak Secondary Capacity: 220-280 MGD (Hydraulic) Population Served: Approx. 330,000 Service Area: City of Akron and 13 surrounding communities (approx. 96 […]