Tag: Wastewater Treatment Plant

Feb 19
Metering Pumps Materials Selection: Cast Iron vs Stainless vs Duplex in Wastewater

Introduction In municipal and industrial wastewater treatment, the precision of chemical dosing is directly linked to process compliance, yet the longevity of the dosing equipment is often compromised by material mismatching. A common point of failure in chemical feed systems is not the mechanical drive mechanism, but the degradation of wetted parts due to unforeseen […]

Feb 19
Progressive Cavity Wet Well Design and Minimum Submergence to Prevent Vortexing

Introduction to PC Pump Intake Hydraulics One of the most persistent and expensive failure modes in municipal wastewater treatment plants involves the premature destruction of progressive cavity (PC) pump stators. While often blamed on “bad rubber” or manufacturing defects, a significant percentage of these failures are actually hydraulic issues rooted in the civil and mechanical […]

Feb 14
Selection Guide: How to Specify Peristaltic for Wastewater Treatment Plants

Introduction In the complex hydraulics of a modern wastewater treatment plant (WWTP), the peristaltic pump—often referred to as a hose pump or tube pump—occupies a critical niche that centrifugal technologies cannot fill. While engineers are intimately familiar with pump curves for water transfer, the specification of positive displacement equipment for abrasive sludge or off-gassing chemicals […]

Feb 12
Stormwater Treatment Systems: Managing Runoff Effectively

Stormwater Treatment Systems: Managing Runoff Effectively Article Overview Article Type: Informational Primary Goal: Provide municipal engineers, wastewater operators, plant design engineers, and equipment manufacturers with a comprehensive, technically rigorous guide to selecting, designing, operating, and evaluating stormwater treatment systems so they can meet regulatory requirements, reduce pollutant loads, and improve resilience to changing rainfall patterns. […]

Feb 11
Greywater Recycling: Sustainable Water Reuse Solutions

Greywater Recycling: Sustainable Water Reuse Solutions Greywater recycling systems provide a practical route to cut potable water use and reduce sewer loads in municipal and large-building projects. This article delivers the engineering, regulatory, and lifecycle guidance needed to scope, specify, and operate nonpotable greywater reuse at scale, with performance targets, instrumentation and monitoring requirements, and […]

Feb 11
City Of Broken Arrow Wastewater Treatment Plant

FACILITY BASIC INFORMATION Plant Name: Lynn Lane Wastewater Treatment Plant (LLWTP) Location: Broken Arrow, Tulsa/Wagoner Counties, Oklahoma Operating Authority: City of Broken Arrow Utilities Department Design Capacity: 8.0 MGD (Average Daily Flow) Peak Hydraulic Capacity: ~24 MGD Current Average Flow: 5.5 – 6.0 MGD Population Served: Approx. 117,000 (Citywide total; split between Lynn Lane and […]

Feb 11
City Of Norman Wastewater Treatment Plant

The authoritative technical resource for the Norman, Oklahoma wastewater infrastructure. FACILITY BASIC INFORMATION Plant Name: Norman Water Reclamation Facility (WRF) Location: Norman, Cleveland County, Oklahoma Operating Authority: Norman Utilities Authority (NUA) Design Capacity: 17.0 MGD (Average Daily Flow) Peak Hydraulic Capacity: 42.5 MGD Current Average Flow: ~11.5 – 13.0 MGD Population Served: ~128,000 residents Service […]

Feb 10
Tulsa Metropolitan Utility Authority North Wastewater Treatment Plant

FACILITY BASIC INFORMATION Plant Name: Northside Wastewater Treatment Plant Location: 5628 N. 105th E. Ave, Tulsa, Tulsa County, Oklahoma Operating Authority: Tulsa Metropolitan Utility Authority (TMUA) / City of Tulsa Design Capacity: 42.6 MGD (Million Gallons per Day) Current Average Flow: ~28-30 MGD Population Served: Approx. 165,000 residents Service Area: North Tulsa, Owasso, Catoosa, and […]

Feb 10
Oklahoma City Water Utilities Trust North Canadian Wastewater Treatment Plant

FACILITY BASIC INFORMATION Plant Name: North Canadian Wastewater Treatment Plant (NCWWTP) Location: 2313 N Eastern Ave, Oklahoma City, OK 73111 Operating Authority: Oklahoma City Water Utilities Trust (OCWUT) Design Capacity: 82.0 MGD (Average Daily Flow) Current Average Flow: ~55-60 MGD Peak Flow Capacity: ~160 MGD Service Area: Central Oklahoma City, Nichols Hills, The Village, and […]

Feb 10
City Of Topeka North Topeka Wastewater Treatment Facility

FACILITY BASIC INFORMATION Plant Name: North Topeka Wastewater Treatment Plant Location: 1600 NW Button Road, Topeka, Shawnee County, Kansas 66618 Operating Authority: City of Topeka Utilities Department (Water Pollution Control Division) Design Capacity: 8.0 MGD (Average Daily Design Flow) Current Average Flow: ~3.6 MGD Peak Hydraulic Capacity: 16.0 MGD Population Served: Approx. 35,000 (North Topeka […]